Fitting A Wet Room Upstairs

Wet Room Shower Installation


We have tilers who are available to hire in any area of Leeds for any kind of tiling job. They are able to install any type of tile including all-natural stone and marble, granites slates ceramics, porcelain, and slates. Our services are available for commercial and domestic projects. A well-designed kitchen can improve the value of your house. Our skilled tilers in Leeds offer high-quality, unique tiling services for floor, wall, and kitchen.

Tilers Leeds 15


You can convert any size bathroom into a wet area. However, if you have a smaller bathroom, it is important to protect your towels, toiletries, and toilet paper from being sprayed. We recommend that you install a divider panel in a small bathroom. If you want to provide greater protection but still have the convenience of a wet area, then our large sliding shower doors are a good compromise.

Installing Wet Room Shower Tray


It is best to choose non-porous ceramic tiles or sheet vinyl when choosing tiles. Stone tiles such as granite and marble will need to be sealed every few months in order to remain waterproof. Underfloor heating is a great option. It not only makes the floor look amazing in winter but also allows for drying out after showering. Effective ventilation is essential for bathroom installation due to the high levels of moisture in the air. An extraction system that pulls moisture from the room and vents it outside should be your goal. Depending on the location of your bathroom, which type of bathroom ventilation fan do you need?

Installing Wet Room Shower Tray
Laying Wet Room Floor

Laying Wet Room Floor




Like most home renovations there are some costs and labor time that can be easily cut if the area has not been prepared well in advance. This includes removing old flooring, whether it is wooden flooring or carpet tiles. Although this is something you can do by yourself, it will require a lot of time and effort. This should be something to keep in mind if you are trying to do it alone. If you are up to the challenge, this can be a great way of saving some money.

Wet Room Installation Concrete Floor



So long as your bathroom is redone from the flooring upwards and the installation is done by a professional, your wetroom will be able to function no matter what sort of house you live in. However, it is important to note that you’ll need a slanted shower drain to allow water to go down, and you’ll need to waterproof (tanking) the entire room. Choose the best materials for your budget – you really don’t want to cut corners, as this could lead to expensive repair costs later down the line.

Wet Room Installation On Concrete Floor

Wet Room Installation On Concrete Floor



Whilst work is being done turning your bathroom into a wet room, you will need a place to shower, go to the toilet and do everything else you normally do in the bathroom. It’s a good idea to understand and plan for all sorts of issues as you prepare for a week or two of work. The installation of a wet room can take anywhere from 4 days to two weeks – this again depends on the size of the wetroom and the additional features you wish to implement.

Wet Room Tray Installation



Any size bathroom can be converted into a wet room, but if your bathroom is on the smaller side, you need to think about protecting your toilet paper, toiletries and towel from getting sprayed. In a small bathroom, we recommend installing a divider panel, or for greater protection without losing the accessibility of a wet room, our large shower sliding doors provide a useful compromise.

Wet Room Tray Installation

Whilst you can tile either one first, popular opinion based on experience is that is is easier to tile the walls first and then the floor, if you are tiling both in a room. This ensures that you keep the floor tiles cleaner as you won't be doing so much work around them once they are installed.
 

Any size bathroom can be converted into a wet room, but if your bathroom is on the smaller side, you need to think about protecting your toilet paper, toiletries and towel from getting sprayed.
 

The installation of a wet room can take anywhere from 4 days to two weeks – this again depends on the size of the wetroom and the additional features you wish to implement.
 

Brass, copper, galvanised steel, cast iron and PVC and these can all play a part in your network of plumbing. In wetrooms, you are most likely to encounter brass or copper pipes. This type of wetroom pipe is likely to last between 50 and 70 years over their natural lifespan.